Post Pour QA
Date
Address
Level
HOLD CONCRETE POUR UNTIL INSTALLATION QA CHECKLIST IS SIGNED OFF
Concrete Strength
Concrete strength ordered checked against structural drawings
Please Select
Yes
No
N/A
Walls Straight
Double check that all walls are plumb and straight
Please Select
Yes
No
N/A
Concrete Slurry
Concrete slurry scrapped off walls
Please Select
Yes
No
N/A
Cavities
Cavities clean and clear
Please Select
Yes
No
N/A
Door Frames
Door frames clean and fixings/spreaders removed
Please Select
Yes
No
N/A
Slab and Beam
Check scope of works for reinforcement connection into slab & beams
Please Select
Yes
No
N/A
Walls Trowelled
Top of walls trowelled to R.L's as specified on latest construction drawings, finished flat and level
Please Select
Yes
No
N/A
Windows Trowelled
Level top of window sills, trowelled finished and clean
Please Select
Yes
No
N/A
Voids
Walls and door frames checked for voids
Please Select
Yes
No
N/A
Patches, Track and Hexy
All patches, track and hexy’s removed from walls right after pour
Please Select
Yes
No
N/A
Wall Top Smooth
Top of wall concrete flat/smooth and reo in centre
Please Select
Yes
No
N/A
Bulges Scrapped
Big bulges scraped back on pour day
Please Select
Yes
No
N/A
Spillage Cleaned
All concrete spillage has been cleaned and sprayed (pour day)
Please Select
Yes
No
N/A
Defects from Others
Defects caused by other trades?
Please Select
Yes
No
N/A
Defects Attend Later
Defects to be attended to at a later date? If so, when?
Please Select
Yes
No
N/A
Supervisor
Image Upload